
16,38 KWP On Grid GES
Ekim 7, 2023
11,06 KWP Hybrid On Grid GES
Ekim 7, 202311,06 KWP Hybrid On Grid GES

Proje Bilgileri
Sistem Türü
On Grid
Kurulu Güç
11,06 KwP
Lokasyon
Ayvalık / Balıkesir
Paneller
38 Ad 395W Half
Inverter
10 Kw Hybrid
Depolama
Mevcut
Sunulan Hizmetler
- Tedarik
- Projelendirme
- Mühendislik
- Montaj
- Bakım
İhtiyacınıza En Uygun
ve Verimli Sistemi Tasarlayalım
Talep formunu doldurarak enerji mühendislerimizden destek alabilirsiniz.
Talep Formu
11,06 KWP Hybrid On Grid GES

Project Information
System Type
On Grid
Installed Power
11,06 KwP
Location
Ayvalık / Balıkesir
Panels
38 Unit 395W Half
Inverter
10 Kw Hybrid
Storage
Available
Services Offered
- Supply
- Project Planning
- Engineering
- Installation
- Maintenance
Let's Design the Most Suitable and Efficient System for Your Needs.
You can get support from our energy engineers by filling out the request form.
Request Form


